Stage 1 · Footings & foundations
Footings: below the frost line, on soil that has never been moved
A footing has two jobs: carry the deck's load to soil that can bear it, and stay put while the soil around it freezes and thaws. Almost every footing failure is one of those two jobs ignored — too shallow, or bearing on fill.
Frost depth is local, and it is not a suggestion
Water in soil expands as it freezes. A footing base above the frost line gets lifted a fraction of an inch each winter and rarely settles back to the same place — the deck racks, doors on the house side bind, railings go out of plumb. Design frost depth runs roughly 12 inches in the deep South, 30–36 inches across the mid-Atlantic and lower Midwest, 42–48 inches in the upper Midwest and New England, and 60 inches or more in the far north. Your building department publishes the number for your town; it is the first fact to get, before any design work.
Sonotubes and poured footings
The standard detail: a cardboard tube form (commonly 10–12 inches in diameter for residential decks) set in a dug hole, with the base flared wider than the tube — the flare, not the tube, provides the bearing area and resists uplift. Concrete is poured, a galvanized post-base bracket is set or bolted on, and the post starts above grade so its end grain never sits in water. Sizing follows tributary area: each footing carries the deck area halfway to its neighbours, and footing diameter grows with that area and shrinks with soil bearing capacity (presumptive values in the IRC run from 1,500 psf for clay/silt to 3,000 psf for sand/gravel and 12,000 psf for bedrock). A 12-inch round footing under a heavily loaded beam line on clay is undersized arithmetic, however tidy it looks.
Helical piers: depth replaced by torque
A helical pier is a steel shaft with helical plates, screwed into the ground by a drive head until a target torque correlates with the required capacity. Advantages are real: no excavation spoil, no concrete cure time, immediate loading, and performance in high water tables or tight access where digging is miserable. Costs run higher per point (the estimator on the cost guide prices them at $340–$480 per pier installed), capacity depends on the installer's torque log being honest, and rocky soil can refuse them outright. Ask for the torque record per pier — a reputable installer hands it over without being asked twice.
Floating decks and deck blocks — the honest limits
Precast deck blocks sitting on grade are legal in many places for low, freestanding decks not attached to the house — and they move with frost, because that is what on-grade means. For a small platform under 30 inches, detached, in a mild climate, that movement may be an acceptable trade. Attached to a house, or tall, or in frost country, blocks are a deferred repair bill. Local rules vary widely here; this is one of the questions the permits chapter tells you to put to your building department in writing.
Soil traps worth naming
- Fill near the house. The soil within a few feet of a foundation was dug out and put back. Footings there must go deeper, to undisturbed soil — a classic reason the ledger-side footings differ from the outer ones.
- Expansive clay. Swells when wet, shrinks when dry; wants deeper, belled footings and drainage kept away from the footing line.
- High water table. Holes that fill with water argue for helical piers or for pumping and pouring promptly — concrete poured into standing water without a plan is weakened concrete.
- Slope. The downhill footing is deeper than the plan suggests, because frost depth is measured from the finished grade at that footing, not from the deck.