Guide + connection service — not a deck builderNational methods authority · your town is asked on the request form

Method Deck
The Method Plates — how a deck is actually put together, stage by stage

Method Deck · The Method Plates

A deck is not a product. It is a sequence of methods — and it fails at the stage that was skipped.

Method Deck is a guide and connection service, not a deck builder. It builds nothing. What it does is show the whole method in the open — footings, frame, surface, rail, finish — with the failure modes, the code facts and the planning prices printed next to their assumptions. When a project is real, one request goes through the request desk, which checks a builder for that specific project before passing anything on.

Stated plainly: no invented reviews, no ratings, no job counts, no testimonials — because this service has no jobs of its own to count. Its work is the homework, done in public.

The five stages — the spine of every page on this site

  1. Stage 1 · Footings. Concrete or helical piers carried below the frost line. A deck that heaves was lost here, before a single board was cut. Footings & foundations
  2. Stage 2 · Frame. Ledger, joists, beams — and the flashing that keeps the ledger joint from rotting the house itself. The most consequential detail in deck building. Framing & ledger flashing
  3. Stage 3 · Surface. Pressure-treated pine, cedar, composite, capped polymer or tropical hardwood — chosen on heat, fade, fasteners and maintenance, not on a brochure photo. Materials compared
  4. Stage 4 · Rail & stair. Guard heights, the 4-inch baluster rule, stair geometry. The stage the code cares about most, because it is the stage people fall from. Railings & stairs
  5. Stage 5 · Finish & keep. Shade, skirting, lighting — and the maintenance calendar that decides whether the deck lasts 15 years or 30. Maintenance & lifespan
Joist plan drawingPlan view of deck framing: ledger board against the house, joists at 16 inches on center, a doubled rim joist, and a beam on posts. HOUSE — ledger board, flashed Joists 16 in. on center · beam mid-span · doubled rim
Plate R-1 — Joist plan. Spacing is a material decision: most composite boards require 16 in. on center, 12 in. for diagonal layouts.

Start where your question lives

“What will it cost?” The cost guide prints a rate ledger first, then an estimator that computes from exactly those printed numbers — checkable by hand.

“Deck or patio?” Slope, soil, height off the ground and budget decide it more honestly than taste does. Patios vs decks works through the trade.

“Do I need a permit?” Usually, yes — and the exceptions are narrower than most people hope. Permits & codes gives the IRC baseline and says plainly where local rules take over.

“My deck feels spongy / leans / sheds its stain.” Diagnosis by stage: heave is Stage 1, bounce is Stage 2 spans, surface failure is Stage 3. The FAQ routes each symptom to its stage.

Request a connection — how it works first