Guide + connection service — not a deck builderNational methods authority · your town is asked on the request form

Method Deck
The Method Plates — how a deck is actually put together, stage by stage

Question file · FAQ

Questions, answered by stage

Each answer names the method stage it belongs to, so a symptom takes you to the chapter that explains it — not to a sales pitch.

How much does a deck cost?

Planning ranges run from about $38–$52 per sq ft for ground-level pressure-treated work to $78–$105 for tropical hardwood, before stairs, railing upgrades and elevation. The cost guide prints the full ledger and an estimator that computes from it. Anyone quoting a single per-foot number without asking about height, soil and railing is guessing in a confident voice.

Do I need a permit?

Usually, yes — if the deck is attached, tall, or sizeable. See permits & codes for the baseline and the honest limits of any general answer: your building department's written answer is the one that counts.

Does composite really need no maintenance?

It needs no staining — it still needs washing, and mould grows on the dirt film in shaded corners of any material. It also gets hot in dark colours and fades toward a stable lighter tone in its first seasons. Stage 3 realities, in full: materials compared.

My deck bounces when people walk on it. Is that dangerous?

Bounce is usually span, not rot: joists spanning farther than their size allows (Stage 2). It feels alarming and is mostly a comfort and confidence problem — until it isn't: check the span discussion, and treat any bounce accompanied by ledger gaps or soft wood as an inspection-now problem.

One corner of my deck lifts every winter.

Classic frost heave — a footing based above the frost line (Stage 1). The fix is a proper footing at that corner, not shimming the symptom each spring. Footings explains the depth rule.

How long should a deck last?

Structure 25 years or more with the annual inspection done; surfaces 15–25 years depending on material. The ledger joint and post bases decide the real number.

Is Method Deck a deck builder?

No. It is a guide and connection service: it builds nothing, employs no crews, and takes no payment for construction. It explains the method, prints planning prices, and passes a request to a builder checked for that project. The full mechanism: how it works.

Why is there no phone number or email address on this site?

Because the service runs one written channel on purpose: the request form. A written request can be reviewed, checked against a builder's actual capacity, and kept on record. Nothing about this service requires a call centre, so it does not pretend to have one.